Insulation and Cladding

Insulation and Cladding

Insulation and Cladding

Insulation and Cladding

ABJ Insulation has setup a facility within the ABJ Engineering Shuaiba facility, consisting of offices, store and state of the art cladding fabrication shop using special computerized equipments. ABJ is up-to-date with the most recent technology, for high degree of specialization. It owes its success to the close cooperation given to the Customers by our technicians and engineers and our skilled workmanship.

ABJ has a facility over an area of 5,500 m2 consists of open storage area, fabrication shop, offices and covered storage. The cladding workshops approximate area 480 m2 is designed to produce 12,000 m2 per month of fabricated cladding material both in aluminum and stainless steel. This capacity can be increased to 20,000 m2 per month by introducing a second shift.

Throughout our existence we have striven for excellence and we pride ourselves in the quality of our work and our ability to meet our commitments. This is what we offer to our Customers.

 

ABJ is having a wide experience in all types of insulation and cladding works for refinery, petrochemicals and power plants for below listed insulation methods

Hot Insulation

Cold Insulation

Acoustic Insulation

Cryogenic Insulation

Personnel Protection

Throughout our existence we have striven for excellence and we pride ourselves in the quality of our work and our ability to meet our commitments. This is what we offer to our Customers.

-ABJ insulation unit is setup at our ABJ Shuaiba Facility complex

-Facility consists of open storage area, fabrication shop, offices and covered storage.

-The cladding workshop (480 m2 Approx) is designed to produce 12,000 m2 per month of fabricated cladding material both in aluminum and stainless steel. This capacity can be increased to 20,000 m2 per month by introducing a second shift.

-The workshop layout and equipment layouts are designed to support the process flow, from cutting to assembly, ready for shipment, to site.

-The fully computerized equipment will also be supported by some manual fabrication as a fall back. The operation under the supervision of well qualified, experienced supervisors.

-Attached to the workshop is a covered storage area of  480 m2 with offices to support this unit.

 

Few Previous Project References

ProjectApprox Scope
KPPC / Aromatics20,000 m2 Equipment Mineral Wool + Al Cladd smooth

100,000 m2 Piping – Ceramic Dual + PIR

TKOC / EG2 Project15,000 m2 Equipment Mineral Wool + 5 different type of Cladding

35,000 m2 Piping Cellular glass + PIR

KPPC / Paresa Tanks17,000 m2 Approx
Equate / HEISCO – LPK Project10,000 m2 Approx
JO – Steam Flood (LSP) Project11,000 m2 Approx
KOC / SAIPEM – BS 160 Project22,000 m2 Approx
GASCO / Tecnimont – Habshan 5 (Abu Dhabi)378,000 m2 Approx
KOC / KNPC / Hyundai– BS 180 Project30,000 m2 Approx
KOC / SAIPEM – BS 171 Project25,000 m2 Approx
KNPC / JGSK JV – Clean Fuel Project

Insulation Works for Mechanical Equipments and Piping  FDH JV /HESCO

Insulation & Cladding of KS-Sulphur Line (Including HSS Application & Field Joints,PullBox,Anchor supports) /SAIPEM

Removal of Existing damaged insulation, Supply & Installation of Cold Insulation Works

35,000 m2 Approx

120,000 m2 Approx

6,215 m2 Approx

2,450 m2 Approx